Pouring a slab

Reinforced slabs, bay by bay

Mesh set out on spacers, reinforcing run to the edges, and the concrete poured one bay at a time.

All case studies

A slab is only as good as what is under the concrete. These photographs show the reinforcing going down and the pours that follow it.

Service
Construction Services · Concrete & Slabs
Stages
2
Photographs
8, from our own jobs and yard
Stage 1 of 2

Setting out the reinforcing

Mesh is laid and spaced on brick spacers, bay by bay, so it sits inside the slab rather than on the ground beneath it.

  • Reinforcing laid for the next section
    Reinforcing laid for the next section
  • A bay of mesh between two cast slabs
    A bay of mesh between two cast slabs
  • Mesh laid and spaced, ready for concrete
    Mesh laid and spaced, ready for concrete
  • Reinforcing set out ahead of the next pour
    Reinforcing set out ahead of the next pour
Stage 2 of 2

Pouring

The concrete is poured along the building line and worked up to the reinforcing at the edge, with the next section's mesh already down beside the last one.

  • Pour meeting the reinforcing at the edge
    Pour meeting the reinforcing at the edge
  • Pouring a slab
    Pouring a slab
  • Fresh concrete placed along the building line
    Fresh concrete placed along the building line
  • Mesh on brick spacers beside a finished slab
    Mesh on brick spacers beside a finished slab
About this serviceConstruction Services

Get a quote

Want this on your site?

Tell us about the job and we will quote it.