From steel box to working space

How a shipping container becomes an office, a shop or a store: openings cut, doors and glazing fitted, the inside lined and fitted out, and the finished unit craned onto site.

A conversion starts as a plain steel container and leaves the yard ready to use. These photographs follow the work in the order it is done.

The photographs are from our own jobs and yard. They are grouped by stage of the work, not taken from one project.

  1. Stage 1 of 5

    Cutting in the openings

    The openings for windows and doors are cut into the corrugated side walls, then framed so the joinery has something square to sit in.

    • Openings cut into the side walls
      Openings cut into the side walls
    • Openings framed for windows and a door
      Openings framed for windows and a door
    • A unit with its door and window cut in
      A unit with its door and window cut in
    • A framed window set into the corrugated wall
      A framed window set into the corrugated wall
  2. Stage 2 of 5

    Doors, glazing and shutters

    Steel doors are hung, glazing and sliding glass fronts go in, and roller shutters and awnings are fitted where the unit needs to be locked up or shaded.

    • Hanging a new steel door
      Hanging a new steel door
    • Fitting a roller shutter
      Fitting a roller shutter
    • Glass sliding doors going in
      Glass sliding doors going in
    • Glazed windows and a shutter along one side
      Glazed windows and a shutter along one side
    • Roller shutters under a new roof overhang
      Roller shutters under a new roof overhang
    • Wide openings with steel awnings
      Wide openings with steel awnings
  3. Stage 3 of 5

    Lining and fit-out

    Inside, the steel is lined, insulated and painted, flooring goes down, and the unit is fitted out for its job: desks for an office, a counter for a shop, shelving for a store.

    • Lined, insulated and painted
      Lined, insulated and painted
    • Office fit-out with laminate flooring
      Office fit-out with laminate flooring
    • Counter fitted over new laminate flooring
      Counter fitted over new laminate flooring
    • Built-in desk run along the length
      Built-in desk run along the length
    • Shelving going in
      Shelving going in
    • Shelving installed for a storage conversion
      Shelving installed for a storage conversion
  4. Stage 4 of 5

    Cladding and finishes

    Where a unit should not look like a container, cladding panels go over the outside, and decking and seating finish the space around it.

    • Cladding panels going on
      Cladding panels going on
    • A fully clad unit before finishing
      A fully clad unit before finishing
    • Sliding glass front and external cladding
      Sliding glass front and external cladding
    • Finished unit with decking and seating
      Finished unit with decking and seating
  5. Stage 5 of 5

    Delivery and in use

    The finished unit is lifted onto the truck, craned in on site and set down level, ready to be used.

    • A finished unit lifted onto the truck
      A finished unit lifted onto the truck
    • Craning in on delivery day
      Craning in on delivery day
    • Set down and levelled on site
      Set down and levelled on site
    • Two conversions with a walkway between
      Two conversions with a walkway between
    • A container shopfront in use
      A container shopfront in use
    • Desks and chairs delivered to a finished office
      Desks and chairs delivered to a finished office
Chat on WhatsApp