A conversion starts as a plain steel container and leaves the yard ready to use. These photographs follow the work in the order it is done.

Service
Construction Services · Container Conversions
Stages
5
Photographs
26, from our own jobs and yard
Stage 1 of 5

Cutting in the openings

The openings for windows and doors are cut into the corrugated side walls, then framed so the joinery has something square to sit in.

  • Openings cut into the side walls
    Openings cut into the side walls
  • Openings framed for windows and a door
    Openings framed for windows and a door
  • A unit with its door and window cut in
    A unit with its door and window cut in
  • A framed window set into the corrugated wall
    A framed window set into the corrugated wall
Stage 2 of 5

Doors, glazing and shutters

Steel doors are hung, glazing and sliding glass fronts go in, and roller shutters and awnings are fitted where the unit needs to be locked up or shaded.

  • Hanging a new steel door
    Hanging a new steel door
  • Fitting a roller shutter
    Fitting a roller shutter
  • Glass sliding doors going in
    Glass sliding doors going in
  • Glazed windows and a shutter along one side
    Glazed windows and a shutter along one side
  • Roller shutters under a new roof overhang
    Roller shutters under a new roof overhang
  • Wide openings with steel awnings
    Wide openings with steel awnings
Stage 3 of 5

Lining and fit-out

Inside, the steel is lined, insulated and painted, flooring goes down, and the unit is fitted out for its job: desks for an office, a counter for a shop, shelving for a store.

  • Lined, insulated and painted
    Lined, insulated and painted
  • Office fit-out with laminate flooring
    Office fit-out with laminate flooring
  • Counter fitted over new laminate flooring
    Counter fitted over new laminate flooring
  • Built-in desk run along the length
    Built-in desk run along the length
  • Shelving going in
    Shelving going in
  • Shelving installed for a storage conversion
    Shelving installed for a storage conversion
Stage 4 of 5

Cladding and finishes

Where a unit should not look like a container, cladding panels go over the outside, and decking and seating finish the space around it.

  • Cladding panels going on
    Cladding panels going on
  • A fully clad unit before finishing
    A fully clad unit before finishing
  • Sliding glass front and external cladding
    Sliding glass front and external cladding
  • Finished unit with decking and seating
    Finished unit with decking and seating
Stage 5 of 5

Delivery and in use

The finished unit is lifted onto the truck, craned in on site and set down level, ready to be used.

  • A finished unit lifted onto the truck
    A finished unit lifted onto the truck
  • Craning in on delivery day
    Craning in on delivery day
  • Set down and levelled on site
    Set down and levelled on site
  • Two conversions with a walkway between
    Two conversions with a walkway between
  • A container shopfront in use
    A container shopfront in use
  • Desks and chairs delivered to a finished office
    Desks and chairs delivered to a finished office